TABLE-TOP: Building Part 2
Having fine but cold weather these past few days has enabled me to complete my Downs of Lewes to the sanding stage. I have completed all eight levels of the Styrofoam construction, being mindful to return and justify the sides repeatedly. They need to be a near to perfectly square as I can make them, requiring re-shaving and sanding back each time a new layer is added . As you can see, it looks quite the colossus in pure white and for the time being my car has taken up residence on the drive. The dots in the mid-left quadrant are figures from my Lewes collection to give some idea of scale. There was a time early in this build that I pondered whether to add another 300mm to the left of this shot (another half tile width) but then decided against it. The table is big enough and players need to be able to reach into the middle from at least one side. I moved straight on to the chamfering stage and started out with a hot-wire cutter - this time a hand held 'Polylon' cutter w